What we move
Construction-grade
materials
Sourced from vetted quarries across the Lagos–Ogun corridor. Every load is weighed, ticketed and verified before it reaches your site.
Sharp Sand
- Concrete mixing
- Block moulding
- Floor screeding
₦110,000 – ₦120,000 / load
Filling Sand
- Land levelling
- Backfill
- Sub-base layer
₦80,000 – ₦100,000 / load
Laterite
- Road base
- Foundation fill
- Embankment works
₦70,000 – ₦90,000 / load
Granite ¾″
- Structural concrete
- Column casting
- Raft foundations
₦150,000 – ₦200,000 / load
Granite ½″
- Surface concrete
- Finishing works
- Paving
₦140,000 – ₦180,000 / load
Stone Base
- Road sub-base
- Interlocking paving
- Drainage bedding
₦130,000 – ₦160,000 / load
Quarry Dust
- Block production
- Interlock filling
- Path stabilisation
₦60,000 – ₦80,000 / load
Aggregate Mix
- Custom project specs
- Mixed-use works
- Bespoke projects
Contact for quote
* Price ranges are indicative. Your quote includes delivery, ticket fee and VAT — shown transparently at checkout.
Our sourcing standard
Every load is verified
before it moves
The construction industry in Nigeria loses billions annually to short loads, wrong-grade material, and drivers who never show up. Motsands closes every gap — from quarry gate to your site.
- ✓
Vetted quarries
Every supplier is verified before we move a load from their site.
- ✓
Quarry ticket issued
A physical and digital ticket confirms material grade and weight at source.
- ✓
Driver identity logged
Driver name, truck plate, and load are recorded at pickup.
- ✓
Site inspection first
Field officer confirms your site can receive the truck before dispatch.
- ✓
Digital proof of delivery
Timestamped photo, weight, and driver signature — every delivery.
Need material at your site?
Get a full price breakdown — delivery, ticket fee, VAT — in under a minute.